Failed to upgrade VCF Operations for Logs 9.0.x to Log Management 9.1.0.0
search cancel

Failed to upgrade VCF Operations for Logs 9.0.x to Log Management 9.1.0.0

book

Article ID: 440809

calendar_today

Updated On:

Products

VCF Operations VMware vSphere ESXi

Issue/Introduction

  • The upgrade failed with this error.

 

  • In Fleet log bundle, you can find ssl thumbprint mismatch error during upgrade procedure.
    services-logs/vcf-fleet-build-service-fleetbuild-#######-#####/fleetbuild/console-log-########.log

    [DATE/TIME] stdout F [DATE/TIME] ERROR Fleet Build 46 [lcm@#### scPath="ops" thread="system-task-worker-14" logger="c.b.v.l.f.b.o.s.OpsPlatformServiceImpl" method="getOpsLogsProperties:L"] [, taskId=########-####-####-####-############] - SSL thumbprint validation failed for Ops Logs at fqdn OPS_LOGS_FQDN

    [DATE/TIME] stdout F com.broadcom.vcf.lcm.build.common.exception.GenericServerException: Provided SSL thumbprint '##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##' does not match the certificate's thumbprint '##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##:##'.
    If the certificate was recently renewed or replaced, update the thumbprint. Check for potential man-in-the-middle attacks if the change was unexpected. 

  • VCF Operations for Logs 9.0.2 will not be accessible using FQDN.

Environment

VCF 9.1

Cause

  • This issue occurs when the upgrade task is configured using the same FQDN for both the new Log Management instance and the existing VCF Operations for Logs instance.

  • A duplicate FQDN configuration causes this conflict. The target Log Management deployment requires a unique, dedicated FQDN that is distinct from the source VCF Operations for Logs FQDN.

  • This issue can also occur due to an SSL certificate thumbprint mismatch between the existing VCF Operations for Logs 9.0 certificate and the newly deployed Log Management 9.1 VSP-based cluster certificate.

Resolution

Resolution of the problem needs to be carried out in the following procedure.

1. Remove or clean Log Management from VSP. Refer to Failed component cleanup during VCF 9.1 installation or upgrade

2. Re-import Operations for Logs 9.0.2 to VSP.

3. Trigger component sync from VCF Operations UI's lifecycle tab.

4. Configure upgrade task again and execute.

 

Please open a case with support for getting detailed workaround.

Additional Information

The failed upgrade entry could be remaining after cleaning and re-import log managment.

But this entry in upgrade plan should not be blocking upgrade task and can be ignored. 

The Engineering team is aware of this issue and will fix it in the next release.