disable/cleanup scheduled report in Aria Operations
search cancel

disable/cleanup scheduled report in Aria Operations

book

Article ID: 440189

calendar_today

Updated On:

Products

VMware Aria Operations (formerly vRealize Operations) 8.x

Issue/Introduction

This article explains how to disable, modify, or delete old scheduled reports configured with email alerts in VMware Aria Operations.

Environment

Aria Operations 8.18. x

Resolution

Follow the steps below to disable or clean up old scheduled reports:
  1. Log in to the Aria Operations UI.
  2. Navigate to: Operations → Reports → Manage --> Schedules (click on the number of schedules)
  3. Locate the old scheduled report.
  4. Select the scheduled report from the list.
  5. Perform one of the following actions:
    • Edit the scheduled report
      • Remove or update the configured email address to stop email alerts.
    OR
    • Delete the scheduled report
      • Remove the obsolete report schedule completely if it is no longer required.
  6. Save the changes.

Additional Information

Reference Link:

Schedule a Report

Delete Scheduled Reports from the VMware Aria Operations database