In(05) vmx - GuestRpcSendTimedOut: message to toolbox-dnd timed out.
In(05) mks - VMMouse: Dropping move received while input queue was full
This issue is resolved in VMware ESXi 8.0 Update 2b 23305546 available at Broadcom Downloads.
For instructions on downloading, refer Download Broadcom products, patches and software
In order to workaround the issue, refer to the steps below:
Power -> Shut Down Guest OS.Edit Settings.Advanced Parameters tab.Attribute : keyboard.allowBothIRQsValue : FALSE