Load Datawarehouse Job Running for way longer after upgrade to 16.3.0(SaaS)
search cancel

Load Datawarehouse Job Running for way longer after upgrade to 16.3.0(SaaS)

book

Article ID: 384872

calendar_today

Updated On: 01-13-2025

Products

Clarity PPM SaaS

Issue/Introduction

 Load Data warehouse Job Running for way longer after upgrade to 16.3.0(SaaS) and eventually fail.
 

Steps to Reproduce

  1. Post upgrade to 16.3.0 run the Job Load Data warehouse in Full load.
  2. Once Job Load Data warehouse in Full load completes, make significant changes to data such as tasks or investments.
  3. Run the DWH incremental Load job.

Expected Results: Job Load Data warehouse job  completes successfully

Actual Results:  Job Load Data warehouse job will timeout after a long execution time.

Environment

16.3.0 

Cause

DE157369

Resolution

DE157369, Fixed in 16.3.1 and backported to 16.3.0 patch 1 

In SaaS DE157369 is fixed with upgrade to 16.3.0