Calendar shows specified dates only until. e.g. DEC, 31st 2011?
Cause2: Using static keywords – no date defined for the period after that date (DEC, 31st 2011)
Cause4: Value NOW_PLUS in Variable UC_SYSTEM_SETTINGS was changed
?
Solution1: Change validity period by editing the static object – right click – Modify validity Period and increase the Field "Valid until".
Solution2: redefine dates
Solution3: install recent hotfixes for your product. Further Information: Easter sunday can not be defined per formula, it has to be entered via static keyword. With some hotfixes this period is being extended.
Solution4: Change value up to 5 (years) Further Information: This value sets the calculating period for calendar definitions (non-static). Default value is 2.
?