Estimated runtime (ERT) is incorrectly calculated in conditions in V11.2
book
Article ID: 87250
calendar_today
Updated On:
Products
CA Automic Workload Automation - Automation Engine
Issue/Introduction
Error Message : U00011545 Max. runtime of task '%' (RunID '%') has been exceeded. Task will be canceled or terminated respectively. or U00011544 Max. runtime of task '%' (RunID '%') has been exceeded. Task '%' will be started.
When attempting to utilize Estimated runtime (ERT), such as an ERT +%50 value for Maximum runtime (MRT), a "runtime of task has exceeded" error similar to one of the above errors may appear when the Job has not reached the max defined ERT value.
Cause type: Defect Root Cause: A problem has been identified where ERT options set in UC_CLIENT_SETTINGS (ERT_METHOD,...) are not considered in the ERT calculation. The default values are used.
Resolution
Update to a fix version listed below or a newer version if available.