Description :The Non-simultaneity condition not working correctly on an uproc when conditioned on its uproc father Completion
Environment
OS: All
Cause
Cause type: By design Root Cause: In fact, it is not possible to use non simultaneity condition between an uproc and its uproc father inside the same session.
Resolution
The are two possible solutions: a) Use an intermediary uproc between both uprocs with the non simultaneity condition b) On the node settings of Dollar Universe, change the job completion settings so that it is performed by the launcher
In order to do so, go to Node settings - DQM Settings
Job completion by uxjobend: Yes --> change it to No ( it will require a restart of the node)