Invalid Processing Date in response to Dollar UORDRE command from Z/Os Manager 3.0.02
book
Article ID: 86876
calendar_today
Updated On:
Products
CA Automic Dollar Universe
Issue/Introduction
Error Message : Invalid Processing Date
Patch level detected:Manager for MVS 3.0.02 Product Version: Dollar.Universe 6.0.0
Parameter PDATE not validated in the $UORDRE command.
When submitting a job from z/OS Manager to Dollar Universe using $UORDRE containing the parameter PDATE, the error message "Invalid Processing Date" results.
Environment
OS: MVS OS Version: N/A
Cause
Cause type: Configuration Root Cause: Problem was the omission of final - on the value of the parameter PDATE.
The syntax given in the documentation named MVS_30_en.pdf works properly: