Error Message :
none

Patch level detected:Dollar Universe 6.3.00
Product Version: Dollar.Universe 6.3.01

Description :When a second outage is planned directly after or overlapping with a already planned outage, jobs that were rescheduled to run at the end of the first outage, disappear when the end of the first outage is reach.

Environment

OS: All

Cause

Cause type:
Defect
Root Cause: N/A

Resolution

Please upgrade to DUAS v6.5.21.

Note that an evolution of the product is planned that allows for jobs to run immediately after an outage is removed.

Fix Status: Released

Fix Version(s):
Component: Application.Server
Version: Dollar.Universe 6.5.21