Description :When a second outage is planned directly after or overlapping with a already planned outage, jobs that were rescheduled to run at the end of the first outage, disappear when the end of the first outage is reach.
Environment
OS: All
Cause
Cause type: Defect Root Cause: N/A
Resolution
Please upgrade to DUAS v6.5.21.
Note that an evolution of the product is planned that allows for jobs to run immediately after an outage is removed.