Description :When the workload forecast for the Production Plan, which has 2 Job Chains containing exactly the same task, is generated; the task is shown twice running for the same day.
# How to reproduce the behavior: -Create 2 business views with the same tasks and deploy them. Two Job Chains will be created. -Create a Production Plan with the 2 job chains. -Perform a workload forecast on the Production Plan.
Environment
OS: All OS Version: ALL OS
Cause
Cause type: By design Root Cause: This is a normal behavior since there are two defined Job Chains containing exactly the same tasks in one Production Plan.
Resolution
This is a normal behavior since there are two defined Job Chains containing exactly the same tasks in one Production Plan.