Description :Job Chains are not updated or with a delay of minutes (upto 15 or even more) BVS engine is at 100 % CPU al the time This issue is most likely to happen with a large set of Job Chains (>100) and when the Job Chains and monitored Uproc are on remote servers
Environment
OS: All
Cause
Cause type: Defect Root Cause: After the initial loading of CDJ infos, the BVS server tries to listen on the network; if the initial loading was too long, the function to listen on the network would have a negative timeout.
Resolution
Update to the fix version listed below or a newer version if available.