Schedule defect after system crash

book

Article ID: 85347

calendar_today

Updated On:

Products

CA Automic Dollar Universe

Issue/Introduction

Error Message :
No error

Patch level detected:Dollar Universe 6.1.00
Product Version: Dollar.Universe 6.1.0

Description :No specific error message but all launches are missing or are not calculated anymore.

Cause

Cause type:
Configuration
Root Cause: A possible cause is that the general calendar is lost or that the calendar data file is corrupted. It can happens after a server crash.

Environment

OS: IBM AIX

Resolution

To solve the issue:

- stop LAUNCHER and CALCULATOR engines
- create a new generic calendar
- reassign rules for all scheduled tasks
- start CALCULATOR engine
- check launches (the goal is to delete the executions that were already executed and so avoid double executions).

If the launches are ok:
start LAUNCHER engine

if the launches are not OK, using command line :
- load environment
- execute following commands
$UXEXE/uxupd tsk upr=* mu=*
$UXEXE/uxupd tsk ses=* mu=*

start LAUNCHER engine


Another possibility is tu use a backup generated before the system crash.

Fix Status: No Fix

Additional Information

Workaround :
N/A