C_PERIOD Object execution not successful because logical date set to '00000000'
book
Article ID: 85091
calendar_today
Updated On:
Products
CA Automic Workload Automation - Automation Engine
Issue/Introduction
Error Message : U00007026 '' activation is processed with the logical date '00000000'.
After Stopping a C_PERIOD Object and setting it to GO again, the first run is not successful.
The logical date is always set to '00000000'', which leads to the above error message in the Activation Report.
Environment
OS Version: N/A
Cause
Cause type: Defect Root Cause: Wrong logical date in periodic object with option "GAP". Activate-period-job in jpexec_r sets the ldatum (and rdatum) fields of AKTX to EH_NextCheck. EH_NextCheck was set to NULL when the period was stopped.
Resolution
Update to a fix version listed below or a newer version if available.
Fix Status: Released
Fix Version(s): Automation Engine 12.1.0 - Available Automation Engine 12.0.2 - Available Automation Engine 11.2.5 - Available