book
Article ID: 73105
calendar_today
Updated On:
Issue/Introduction
How can I start CA TPX with an alternate SMRT or SAMT without changing the PROC?
Resolution
You can start the CA TPX task with parms to override any of the parameters defined in the TPX PROC such as SMRT=xxx,SAMT=xxx:
S TPX,SMRT=SMRTSAF,SAMT=SAF
This saves having to RELOAD in TPXOPER, especially since some SMRT parameters cannot be reloaded.