Running the Endevor CONRPT72, is it required to put the after = and before = dates
search cancel

Running the Endevor CONRPT72, is it required to put the after = and before = dates

book

Article ID: 69821

calendar_today

Updated On:

Products

Endevor

Issue/Introduction

I am trying to run the package summary report for a range of two days.  Is it still required to put both the After = and the Before = dates?  Can I change the dates from MMDDYYYY to current date?

Environment

All Supported Releases

Resolution

Both of the dates are required.  If you leave one off, the output that you get will not be consistent with the information that is requested. 
As far as modifying the MMDDYYYY to another value (current date), the software is only looking for MMDDYYYY and cannot be modified.