What are the two different types of coupling facility rebuilds available to recover from a TPX CF failure?
book
Article ID: 51900
calendar_today
Updated On:
Products
TPX - Session Management
Issue/Introduction
Coupling facility (CF) failures require a TPX reconnect using REBUILD function.
Resolution
If the Coupling Facility (CF) feature is in use with Generic Resources and a CF failure occurs then managed rebuilds are required based upon what kind of CF failure is observed:
System managed rebuild is a "controlled" situation where a command is issued from the console to start the rebuild and then stop the rebuild.
User managed rebuild or Application managed rebuild (both names get used) deals with recovering from a CF structure disconnect.