SPECTRUM Report Manager scheduled report failed with error: "Information is needed before this report can be processed".
Release: Any
Component: SPCRPT
Evidence of the failed scheduled report:
Even if all the parameter values are specified on Schedule page, you must click the [Set Parameter Value] button to save the parameter values.