SPECTRUM Report Manager scheduled report failed with error: "Information is needed before this report can be processed".
search cancel

SPECTRUM Report Manager scheduled report failed with error: "Information is needed before this report can be processed".

book

Article ID: 51810

calendar_today

Updated On:

Products

Spectrum

Issue/Introduction

SPECTRUM Report Manager scheduled report failed with error: "Information is needed before this report can be processed".

Environment

Release: Any
Component: SPCRPT

Resolution

Evidence of the failed scheduled report:

 

Even if all the parameter values are specified on Schedule page, you must click the [Set Parameter Value] button to save the parameter values.