The following steps will provide information on setting up your Forecast job to run daily:
Note: a requirement is that the Forecast job must run under CA Jobtrac JM's control to use the JMF substitution.
- CA Jobtrac JM SCL will be needed to schedule this job daily or using the process period of your choice
*EVENTNM TIME DATE DEPS RELEASE1RELEASE2RELEASE3RELEASE4 PROCESSP OPDCCDE
FORECAST ASAPS* DAILY 0000
- JMF variable will need to be defined to JMF as follows:
OSDDATE:
TODDATE:
JDATE=&:OSGYYYY.&:OSDDD
- The JMF table will need to be loaded by issuing the following command:
F JOBTRAC,JMFLOD
- The Forecast job found in the CA Jobtrac JM SAMPJCL library will need the following JMF variable added to the sysin JDATE parameter:
JDATE=&:JMFDATE