Importing an Existing vCenter Server as a VI Workload Domain Fails at "Create Transport Node Collections" with Error 26195
search cancel

Importing an Existing vCenter Server as a VI Workload Domain Fails at "Create Transport Node Collections" with Error 26195

book

Article ID: 462632

calendar_today

Updated On:

Products

VMware NSX

Issue/Introduction

  • Importing an existing vCenter Server into a greenfield VCF environment as a Virtual Infrastructure (VI) workload domain fails at the Create Transport Node Collections subtask with the message: Error in configuring transport node collections.

  • In SDDC Manager (/var/log/vmware/vcf/domainmanager/domainmanager.log), the workflow fails during CreateOverlayAndVlanBackedTransportNodeCollectionAction with the following stack trace:

    ERROR vcf_dm ... [c.v.v.c.f.p.n.p.a.CreateOverlayAndVlanBackedTransportNodeCollectionAction,handleAsyncTaskResult,604] TNC creation failed for cluster <cluster-name> (MoId: domain-c<id>)
    com.vmware.evo.sddc.orchestrator.exceptions.OrchTaskException: Error in configuring transport node collections
    Caused by: java.lang.RuntimeException: Failed to create transport node collection
        at com.vmware.vcf.common.fsm.plugins.nsxt.helpers.NsxtUtils.checkClusterState(NsxtUtils.java:1946)
    
  • In the NSX Manager UI (System > Fabric > Hosts > Clusters), target clusters report a Preparation Failed state with error 26195:

    26195: Pushing NSX depot(s) on Compute Manager: <compute-manager-uuid> failed with error: org.springframework.web.client.ResourceAccessException: I/O error on GET request for "https://<target-vcenter-fqdn>:443/api/esx/settings/depots/offline": Connect to https://<target-vcenter-fqdn>:443 [<target-vcenter-fqdn>/<target-vcenter-ip>] failed: Connection refused.
    
  • On the target vCenter Server, rhttpproxy and vmware-updatemgr services are confirmed Running, and vLCM image compliance checks report all hosts compliant.

  • Node-by-node network testing from the NSX Manager appliances to the target vCenter Server on TCP port 443 shows asymmetric connectivity (e.g., one NSX Manager node succeeds while the remaining two nodes receive Connection refused).

 

Environment

VMware Cloud Foundation 9.x

VMware NSX 

VMware vCenter Server 8.x

 

Cause

An intermediate firewall policy is blocking TCP port 443 (HTTPS) traffic from one or more individual NSX Manager appliance nodes to the target workload domain vCenter Server.

During Transport Node Collection (TNC) realization on vLCM-managed clusters, NSX Manager pushes offline NSX VIB depots to vCenter Server via the /api/esx/settings/depots/offline REST API over TCP port 443.

Because the NSX Manager cluster distributes management and depot-push operations across all three appliance nodes, the task fails whenever a node lacking firewall clearance initiates the connection—even if connectivity checks succeed from another NSX Manager node or the ESXi hosts.

Resolution

 

  • Update Firewall Rules for All NSX Manager Nodes: Configure network firewall policies to permit TCP port 443 (HTTPS) traffic from all individual NSX Manager node IP addresses (Node 1, Node 2, and Node 3) as well as the NSX Manager cluster VIP to the target vCenter Server (<target-vcenter-fqdn> / <target-vcenter-ip>).

  • Verify Port 443 Connectivity from Every NSX Manager Appliance: Log in via SSH as root to each of the three NSX Manager nodes and confirm port 443 reachability to the target vCenter Server:

    nc -zv <target-vcenter-fqdn> 443
    curl -kv https://<target-vcenter-fqdn>
    

    Ensure all three nodes establish a connection without Connection refused or timeout errors.

  • Retry the VI Workload Domain Import: Once all NSX Manager nodes can reach the target vCenter Server on port 443, log in to SDDC Manager and retry the failed Import vCenter as a VI Domain workflow. NSX will push the offline VIB depots, complete Transport Node Collection realization, and finish the domain import.