Scheduled reports fails to generate in PDF format in VMware Cloud Foundation (VCF) Operations 9.0.2
search cancel

Scheduled reports fails to generate in PDF format in VMware Cloud Foundation (VCF) Operations 9.0.2

book

Article ID: 460196

calendar_today

Updated On:

Products

VCF Operations

Issue/Introduction

  • Failures may occur during scheduled PDF report generation in VCF Operations 9.0.2.

  • Symptoms involve rendering timeouts, causing report job failure while other tasks proceed.

    Messages similar to the following can be found in reporting.log:

[com.vmware.vcops.bridge.content.server.report.PdfRenderer.processStepWithTimeout] - Open page timed out for page: ##

[com.vmware.vcops.bridge.content.server.report.PdfRenderer.processStepWithTimeout] - Await for load done timed out for page: ##

Environment

VMware Cloud Foundation (VCF) Operations 9.0.2

Cause

A known issue in the VCF Operations 9.0.2 rendering engine triggers timeout thresholds during PDF creation.

 

Resolution

  • Update:
    Update to VCF Operations 9.1.0 or later. This release addresses the rendering engine timeout issue.

VMware Cloud Foundation 9.1.0 Release Notes - Resolved Issues

Report generation stops working with new reports remaining stuck in the "In queue" status

During report generation, the system may encounter timeouts while attempting to load and render certain report pages. When this occurs, an issue in handling these timeouts causes the internal report generation service to become permanently blocked. Consequently, all subsequent report requests are unable to process, remaining stuck in the "In queue" status and eventually failing.

  • Workaround:
    To restore reporting:
    1. During a maintenance window, use the Operations administration interface to bring the cluster offline, then online. This clears the blocked report worker and temporarily interrupts monitoring.

    2. Once the cluster is online, create a copy of the report with CSV enabled and PDF disabled, then generate it for the required reporting period.

CSV-only generation bypasses the affected PDF rendering process. Restarting alone restores reporting temporarily; generating graphical PDFs may trigger the issue again.

 

Additional Information

VMware Cloud Foundation (VCF) Operations 9.0.2 にて、スケジュールされた PDF 形式のレポート生成に失敗する