vMotion migrations frequently fail in stretched or multi-site clusters when network pathing becomes asymmetric.
The vSphere Client displays the error: The vMotion failed because the destination host did not receive data from the source host on the vMotion network. Please check your vMotion network settings and physical network configuration and ensure they are correct.
Connectivity verification shows unidirectional traffic: ICMP packets from Site 1 reach Site 2, but response traffic from Site 2 fails to return to Site 1.
vmkping from the vMotion adapter (e.g., vmk1) shows 100% packet loss between hosts in different sites.
The vmx log contains entries similar to: Migration [-1062699939:5181212996128058746] failed to connect to remote host <####> from host <####>: Host is down.
Asymmetric network pathing caused by mismatched Active/Standby uplink order on vMotion port groups across different physical sites.
This issue is caused by inconsistent Uplink Teaming and Failover (Active/Standby) policy configurations on the Distributed Switch (vDS) or Standard Switch port groups across sites.
This leads to asymmetric network pathing where egress traffic from one site is dispatched via an unroutable or mismatched physical interface, preventing the bi-directional communication required for vMotion.
To resolve this issue, ensure symmetric bi-directional network communication by aligning the uplink order:
vmkping -I vmkX <Destination_vMotion_IP> from both sites to confirm bi-directional traffic.To speak with a customer representative or a Support Engineer see . Scroll to the bottom of the page and click on your respective region.
For instructions on retrieving ESXi logs to verify network timeouts, see .