You are observing that for the Material resource type allocation hours are not populated in DWH_INV_TEAM_PER_FACTS_M_V.
Steps to Reproduce:
- Create a financially enabled project.
- Add four staff members to the project team, one of each: a named Labor resource, a Role, an Equipment resource (type "Hardware"), and a Material resource.
- Ensure the project's Transaction Matrix has Rate Source and Cost Source configured for all four resource types (Labor Matrix + non-labor Matrix segments for Equipment and Material).
- Run Rate Matrix Extraction job (Prepare + Update, full).
- Give each of the four team members an allocation (hours/units) on the Team page.
- Run Update Cost Totals on the project.
- Confirm in Clarity UI (Staff/Team page) that all four resources show both Allocation and Allocation Cost.
- Run the Time Slicing job(s).
- Run Load Data Warehouse (Full).
Expected Results: alloc_hours are populated in DWH_INV_TEAM_PER_FACTS_V for Material type.
Actual Results: alloc_hours are NOT populated in DWH_INV_TEAM_PER_FACTS_V for Material type.