The Gantt Widget in 'Project Schedule' tab of 'Project Schedule and Cost (Sample)' report displays the monthly time periods correctly. However when you export the widget as a .png the
label names are no longer readable.
This affects any column label that cannot fit the label name in the space provided.
Steps To Reproduce:
1. Open the out of the box Report 'Project Schedule and Cost (Sample)'
2. Click on 'Project Schedule' tab to display 'Project Schedule by Type'
3. In the top right corner of the 'Project Schedule by Type' report, click on 'Download' icon to download report.
Expected: Export output of the report displays data correctly
Actual: The date labels in the Gantt Widget section are not readable.
Clarity 16.4.2
DE209210
This is fixed in Clarity 16.4.3 patch 1 and Clarity 16.5.0