Scheduler Orphan Cleanup script will set DWH SYNC job to Cancelled after BG restart, maintenance or sometimes in Clarity in some update operations as part of race condition. This causes Load DWH job to remain stuck in Waiting and data is not updated
STEPS TO REPRODUCE:
Alternate steps:
< This only happens on very large dataset where Project Create from Template is very slow. >
Expected Results: DWH SYNC to not be set to Cancelled – let dwh initializer handle the job state
Actual Results: DWH SYNC is moved to Cancelled state. Load DWH is stuck in Waiting. DBA / Hosting team will be required to fix the issue
Clarity 16.4.0, 16.4.1, 16.4.2
DE204553
In Review by Engineering
Workaround: