Issue/Introduction

When creating a new VMware Cloud Foundation (VCF) Workload Domain or executing a Brownfield Import / Convert operation, the workflow fails during the "NSX deployment resource validation" precheck.

The SDDC Manager UI or domainmanager.log reports a critical failure blocking deployment:

NOT_ENOUGH_RESOURCES_IN_MANAGEMENT_DOMAIN Not enough resources found in management domain. Required CPU:<CPU> vCpus, Memory: <MEM> GB, Storage: <STORAGE> GB. Available CPU:<CPU> vCpus, Memory:<MEM> GB, Storage: <STORAGE> GB.

This failure occurs when the target cluster's total registered virtual machines allocated memory resources exceed the cluster capacity.

 

Environment

VMware Cloud Foundation 9.0.1
VMware Cloud Foundation 9.0.2
VMware Cloud Foundation 9.1
VMware Cloud Foundation 5.2.x

Cause

A software defect in the NSX deployment resource validation logic incorrectly factors powered-off virtual machines into the active cluster resource utilization calculations.

Resolution

This issue is resolved in VMware Cloud Foundation 9.1.1 

RESOLUTION:

  1. Log in to the SDDC Manager appliance via SSH using the vcf account and switch to the root user (su -).

  2. Open the Domain Manager properties file in a text editor: vi /etc/vmware/vcf/domainmanager/application-prod.properties

  3. Append the appropriate property based on the VCF version:

    • For VCF 9.0.x: Bypasses the domain resources validation entirely with. nsx.domain.resources.validation.skip=true

    • For VCF 9.1 and 5.2.x: Excludes powered-off VMs from the validation check. nsx.deployment.resource.validator.exclude.powered.off.vms=true

  4. Save the file and exit the text editor.

  5. Restart the Domain Manager service to apply the changes: systemctl restart domainmanager

  6. Retry the workload domain deployment workflow from the SDDC Manager UI.

  7. Upon success revert the changes made by switching the values to false or removing them entirely from the application-prod.properties file.

Important: This is a custom override. If the powered-off VMs are powered on after NSX is deployed, the cluster may become resource-constrained. Enable this flag only after confirming that the inactive VMs are permanently decommissioned.

Additional Information

Skip Domain Resources Validation prior to NSX Deployment