What is the END time being shown in the output of CA 7 command LRLOG for a job with a JCLERR status?
Jobs in JCLERR status, either after a DEMAND,TYPE=RES or a true JCL ERROR have no actual END time.
The time displayed will be the DUE OUT time of the job.