VMware vSphere ESXi 8.x
VMware vSphere ESXi 9.x
This issue can be caused by physical connectivity errors introduced during the storage array relocation, specifically cross-site cabling.
If the storage array is incorrectly cabled to the fabric or the hosts, the ESXi storage stack cannot establish valid paths, leading to timeouts during the discovery (rescan) phase.
To resolve this issue, perform a thorough audit of the physical and logical storage connectivity:
Verify Physical Cabling:
Check Switch Zoning/Connectivity
Confirm Array Presentation:
Perform Storage Rescan:
Note: Incorrect cabling can lead to All Paths Down (APD) or Permanent Device Loss (PDL) conditions if existing datastores are expected on the moved array. Ensure all VMs are migrated or powered off before performing physical moves.