In Staff Grid, when Unit of Measure is set to % Availability (any other Unit of Measure except Hours), the filter on ETC / Allocation and other per period metrics does not work as expected. This happens for Greater than, Less than, Between operators
STEPS TO REPRODUCE:
Expected Results: The Allocation to be filtered out accordingly
Actual Results: Rows display for Allocation Greater than 100 that do not correspond to the criteria
Same happens for ETC and other metrics and other Unit of Measures except Hours.
Clarity 16.3.3, 16.4.0, 16.4.1
DE184100
In Review by Engineering