Material and Expenses roles ETC is changed when opened in Microsoft Project (MSP). Labor and Equipment is not affected by the same. When saving the project, the new ETC values from MSP will also be saved in PPM.
Steps to Reproduce
Expected Results: ETC for all roles is 70
Actual Results: ETC for Material and Expense roles is 69
This is caused by CLRT-81350/DE29511.
This issue is fixed in CA PPM 14.4 patch 5, 15.1 patch 3, and 15.2