When trying to replace the certificate from VMware vRealize Suite Lifecycle Manager(VRLCM) to update the VMware Identity Manager (vIDM) certificate, the process consistently fails with below error specifically at Stage 5 – "Remediate VMware Identity Manager node(s)", with the subsequent step "Perform PCP Recovery" being the point of error.
VMware Identity Manager 3.3.x
There is an error on vIDM dashboard as below:
Analytics connection: Connection test failed.
Follow the steps below to resolve the issue.