The vSAN cluster fails to restart after a manual shutdown using the prepare script documented in Manually Shut Down and Restart the vSAN Cluster
VMware VSAN 7.x
VMware VSAN 8.x
Connectivity failed due to an MTU mismatch between the data and witness nodes.
Data nodes were set to 9000 MTU while the Witness was set to 1500 MTU.
Please ensure the MTU is consistent across all nodes, then restart the management services on the ESXi hosts for the changes to take effect.
Re-run the recover script.
Once the script completes successfully, continue with the steps documented in Manually Shut Down and Restart the vSAN Cluster
https://knowledge.broadcom.com/external/article?articleNumber=390160