If replication is manually paused and then resumed, is the pause duration taken into account when calculating the next replication start time?
vSphere Replication 8.x
vSphere Replication 9.x
Even if replication is manually paused, the pause duration is not factored into the next scheduled start time.
The scheduler plans replication runs to meet the configured RPO based on observed replication characteristics.
The next synchronization start time is calculated based on recent history, including:
For details about the scheduling algorithm, refer to:
How the Recovery Point Objective Affects Replication Scheduling