ConnectALL Jira OnPrem to Rally automation syncing is slow
search cancel

ConnectALL Jira OnPrem to Rally automation syncing is slow

book

Article ID: 426015

calendar_today

Updated On:

Products

ConnectAll On-Prem ConnectALL

Issue/Introduction

Steps to Reproduce: 

  1. Run existing Multi Variate Automation between Jira OnPrem and Rally.
  2. Majority of sync takes longer time to update the records to destination.

 

Actual Results: 
Sync started slowing down for majority of automations.

 

Expected Results: 
There should not eb any slowness as in past the records synced really fast with the current thread configured.

Environment

4.0

Cause

DE180974

Resolution

Fixed in 4.1.0 and ported back to patch 4.0.3