Steps to Reproduce:
Have a dropdown field in Jira (I use Agile Team in our Jira 9.9) that shares a couple of values across multiple projects. For
example Project 1 with Alpha and Beta as values in the dropdown, and Project 2 with Alpha and Beta values in the same dropdown.
Actual Results:
Values changes to the IDs in the newly selected template project
Expected Results:
Values do not change.
4.0
DE180461
Fixed in 4.1.0 and ported back in patch 4.0.2