VMware Aria Operations upgrade may fail if any node in the cluster is configured with the deprecated timezone US/Pacific-New. This timezone alias has been removed in more recent PostgreSQL database releases, and systems using it can encounter errors during upgrade validation or database migration.
Aria Operations 8.17
PostgreSQL database systems no longer support the US/Pacific-New timezone, which was just an alias for America/Los_Angeles timezone. If any of the VMware Aria Operations nodes are running on VMs with US/Pacific-New timezone, upgrade might fail.
This issue impacts any Aria Operations node, including:
Primary node
Replica node
Data nodes
Cloud Proxy (if applicable)
SSH to each Aria Operations node and run:
It is recommended to first take a snapshot of the appliance (without memory) before proceeding.
In the web console, log in to the appliance.
First, confirm the current timezone with the command:
timedatectl
By default, the timezone should be set to UTC.
Then, to change the timezone to e.g. PST, issue the command:
timedatectl set-timezone America/Los_Angeles
To list the available timezones, issue the command:
timedatectl list-timezones
WorkAround : Change VM timezones from US/Pacific-New to America/Los_Angeles, and then upgrade.
Refer Techdoc
https://techdocs.broadcom.com/us/en/vmware-cis/aria/aria-operations/8-17-1/Chunk436249168.html