In Aria Operations, VM memory costs are calculated high. For example, a VM with 16 GB of memory shows a daily cost far above expected, despite cost drivers (VC Pricing, VCD Pricing) being configured and applied globally and at the object level.
Aria Operations 8.18.x
The VMs for which incorrect cost values are shown are deriving its base cost value from its associated VCD Org/Resource Pool