Jira Sprint field sync by value to Rally does not work if completed sprints are missing in Rally
Steps to Reproduce:
Expected Results:
Sprint B should be synced to Rally Iteration field
Actual Results:
Depending on the lookup setting, either failure or the field is skipped.
Jira Connector puts all Sprint values (including completed Sprints) in the Entity field, Rally will try to lookup both, and fail since Sprint A does not exist.
DE177439
Update to version 4.0