Unable to power on a VM on the protected side after a planned migration failed.
There is no option to power on the VM
VLSR 8.x
VLSR 9.x
- As part of a planned migration, the VM on the protected site will be shut down gracefully, unregistered.
- The datastore will be unmounted, and the LUN will be detached.
- To power on the VM on the protected site manually, it needs to attach the LUN to the hosts, mount the datastore, and register the VM manually.