With the Tasks Details flyout open, on the To Dos subtab, navigating between different task rows, the list of To Dos is not refreshed to display associated To Dos with the highlighted task. It still shows the To Dos list from the prior selected Task.
You can observe the same behavior with To Dos on Risks, Issues or Changes.
STEPS TO REPRODUCE:
Expected Results: The To Dos tab does not show any To Do
Actual Results: The To Dos tab shows the To Dos of the previous tasks
Note: If both Tasks have To Dos, the To Dos do not refresh and when navigating to the second task, the To Dos of the first task display
This will also happen on Risks, Issues and Changes with To Dos.
Clarity 16.3.3
The issue described above was addressed through DE173301
Fixed in: