Update Aggregated job gets stuck in Processing after spinning off a second instance
search cancel

Update Aggregated job gets stuck in Processing after spinning off a second instance

book

Article ID: 412061

calendar_today

Updated On:

Products

Clarity PPM SaaS Clarity PPM On Premise

Issue/Introduction

Update Hierarchy Data job gets stuck in Processing and creates jobs bottleneck. Second instance will start with same exact timestamp and complete.

Processing Job is in CMN_SCH_JOBS and CMN_JOB_SCH_RUNS but not in CMN_SCH_JOB_CURR_RUNS.

Error Exception due to DB Connection failure08006 in BG logs

 

STEPS TO REPRODUCE:

  1. Schedule Update Aggregated job to run regularly on your environment

Expected Results: The Update Aggregated job to run consistently and to be either in Failed or Completed status. If there is an error, job should be marked as Failed

Actual Results:  Once in a while the job will get stuck in Processing, a second instance is getting span off that completes successfully with the same timestamp. All other incompatible jobs will be queued up

Environment

Clarity 16.2.3.2

Cause

DE176444

Resolution

This is DE176444, in review by Engineering

Workaround: Restart BG, ensure the job is no longer Processing.