After upgrade to 16.3.2, the Load Data Warehouse Scheduled jobs get cancelled. After upgrade, the admin has to reschedule them manually
STEPS TO REPRODUCE:
Expected Results: Load Data Warehouse jobs to remain Scheduled or Paused as they were prior to upgrade
Actual Results: Load DWH jobs are Cancelled and the admin has to reschedule them
Clarity 16.3.2
DE171026
Workaround: Reschedule the Load DWH jobs manually in UI
Best Practices: