Incorrect totals are displayed in per-periods for TSV percentage type attribute
Steps to Reproduce:
Expected Results:
The Totals are displayed for the TSV Percentage field on the master object and sub-object
Actual Results:
The Totals row is zero for TSV percentage field on master object (Project) and Sub-object.
v16.3.1
Due to DE170176
Engineering has reviewed DE170176 and confirmed that it working as per design. New UI does not allow aggregations for TSVs using Percent.