Upgrading Aria Operations for Networks to version 6.14 and version 9.0 is stuck and not progressing further.
book
Article ID: 395718
calendar_today
Updated On:
Products
VCF Operations for Networks
Issue/Introduction
As shown in the screenshot, the upgrade may get stuck at Stage 6, though it could also stall at a different stage depending on the environment.
During the issue, connectivity between the platform nodes may be lost, and ping tests between them may fail.
Validate Secure Tunnel Status:
SSH into each platform node in the cluster using the consoleuser account.
Run the following command to verify if IPsec (Secure Tunnel) is enabled:
secure-tunnel -s
Verify Inter-Node Communication:
Use the ping command to test connectivity between the platform nodes.
If the secure tunnel is enabled and the nodes are unable to communicate (pings fail), it indicates an issue with the secure tunnel connectivity.
Environment
Aria Operations for Networks 6.12
Aria Operations for Networks 6.13
Aria Operations for Networks 6.14
VCF Operations for Networks 9.0
Cause
The IPSec services may become disabled during the upgrade process, leading to inter-node communication issues and cluster instability and upgrade being stuck.
Resolution
This is a known issue affecting VCF Operations for Networks.
If you believe you have encountered this issue, please open a support case with Broadcom Support and refer to this KB article.