clamping property for OI and APM integration.
search cancel

clamping property for OI and APM integration.

book

Article ID: 390675

calendar_today

Updated On:

Products

CA Application Performance Management (APM / Wily / Introscope)

Issue/Introduction

CA APM on-premise 10.8 SP1 (cluster) has been integrated with DX SAAS.

How to increase the limit of metrics that are being sent from on premise APM 10.8 cluster to DX SAAS?

Based on the observation from the integration related metrics and from the EM logs, it looks like current limit is 60000 per EM. See this message in the APM 10.8 EM log.

 [Event Pump Entity] Manager.APM.OI : Clamp set on resultset for  60000 Metrics

Environment

CA APM 10.8 SP1 (cluster)

DX SAAS

Resolution

You can set following property on EM

Add in IntroscopeEnterpriseManager.properties file:

Example:

introscope.enterprisemanager.doi.plugin.clamp.count=90000

You increasing this value gradually. You may have to increase the min and max heap settings on the EM JVM.