Issue/Introduction
While configuring a Bulk Migration in HCX, the workflow fails upon clicking the "VALIDATE" button, displaying the following error: "The selected target compute container is not connected to the target storage or network."
Resolution
Confirm the target Compute Container (Cluster/Host) has access to the storage and network chosen in the VM for Migration wizard
If multiple networks are available and the Network Names are the same, ensure the destination Compute Container (Cluster/Host) has access to the Switch listed for that Network Name and the checkbox is selected for that network name and corresponding Switch