MUX Timesheet - Past Time Period gets defaulted to present week's Time Period

book

Article ID: 384279

calendar_today

Updated On:

Products

Clarity PPM SaaS Clarity PPM On Premise

Issue/Introduction

On MUX Timesheet, when a past time period is selected for a populated timesheet, if page is refreshed then the Time Period defaults to the present week's Time Period from the past selected Time Period. If, on the URL, the past Time Period's ID is manually entered then the Timesheet retains this past Time Period, however again on a page refresh or a Timesheet tab navigation, the Timesheet again defaults to the present week's Time Period

STEPS TO REPRODUCE:

1 Log into MUX and navigate to the Timesheet. It will default to the present week's Time Period

2 Select a past open Time Period and populate the Timesheet

3 While updating this timesheet, do either of the following:

  • Click on another tab: Review and Approve or Timesheets
  • Refresh the browser
  • Copy the timesheet URL and paste it on new browser tab


Expected Results :-

The timesheet workspace refreshes and retains the Time Period which is being worked upon

Actual Results :-

The timesheet workspace refreshes and defaults back to the present week's Time Period

Environment

PPM 16.3.0, 16.2.3

Cause

DE157339

Resolution

The resolution for this is included in 16.3.2, 16.3.1.1 (16.3.1 Patch 1), and 16.2.3.3 (16.2.3 Patch 3)