Processes stuck after upgrading to 16.2.3
search cancel

Processes stuck after upgrading to 16.2.3

book

Article ID: 377787

calendar_today

Updated On:

Products

Clarity PPM On Premise Clarity PPM SaaS

Issue/Introduction

  1. Processes are getting stuck randomly or progress very slowly, slower than before upgrade. Following messages are visible in bg-ca.log:

    ERROR 2024-09-11 09:18:57,295 [Event Handler pool-3-thread-4] bpm.eventmgr (clarity:unknown:session:none) () An error occurred while processing event Event{_messageId='5672721', _objectTypeCode='stepaction', _objectId=5354662, _eventCode='BPM_SAE_DONE', _userId=8, _impersonatedBy=-1, _timestamp=2024-09-11 09:18:56.682, _autoStartProcessed=false, _deleteEventProcessed=true, _pushingEngineProcessed=false} java.lang.NullPointerException: Cannot invoke "com.niku.union.security.SecurityIdentifier.getSessionId()" because "secId" is null

    FATAL 2024-09-11 09:19:01,068 [Post Condition Transition Pipeline 0 (tenant=clarity)] union.cache (clarity:user:session:none) () Session in use count already reached to 0 at com.niku.union.utility.caching.CacheController.setSessionInUse(CacheController.java:963)

  2. Processes that typically finish in less than a minute can all of a sudden take more time to complete.

Environment

  • Clarity 16.2.3

Cause

  • DE154010

Resolution

  • DE154010 is fixed in:
    • 16.3.0 (targeted for GA mid-November 2024)
    • 16.2.3 Patch 1
  • The second error will persist after the upgrade to the aforementioned releases. This error is benign and can be disregarded. A fix is planned to suppress this error in subsequent releases.

Additional Information

  • DE154010 is fixed in Clarity SaaS (Broadcom) with Pre-Patch 3