The "Next" button is grayed out during VMware Aria Operations or VMware Aria Operations for Logs scale-out from Aria Suite lifecycle 8.18, saying "Fill all the nodes with proper details" despite all fields being completed.
search cancel

The "Next" button is grayed out during VMware Aria Operations or VMware Aria Operations for Logs scale-out from Aria Suite lifecycle 8.18, saying "Fill all the nodes with proper details" despite all fields being completed.

book

Article ID: 375873

calendar_today

Updated On:

Products

VMware Aria Suite

Issue/Introduction

Scaling out VMware Aria Operations or VMware Aria Operations for Logs from Aria Suite lifecycle, it says "Fill all the nodes with proper details" despite all fields being completed.
Below is the screenshot for reference.

Environment

VMware Aria Suite Lifecycle 8.16
VMware Aria Suite Lifecycle 8.18
VMware Aria Operations 8.16
VMware Aria Operations 8.18
VMware Aria Operations for Logs 8.16
VMware Aria Operations for Logs 8.18

Resolution

This is a known issue and resolved by upgrading Aria Suite Lifecycle to version 8.18 Patch 1 or newer.

VMware Aria Suite Lifecycle 8.18 Patch 1 Release Notes