Cost Plan 'Could Not Load Total Row' error
book
Article ID: 372058
calendar_today
Updated On:
Products
Clarity PPM SaaS
Issue/Introduction
Steps to Reproduce:
- Login to New UX
- Navigate Projects
- Pick a Project -> Navigate to Financials -> Cost Plans -> Cost Plan per period metric should be populated
- Under Cost Plan Details, make sure that "Show Total Row" is checked
- Create New Cost Plan -> Open the newly created cost plan
Expected Result: Cost Plan should open properly
Actual Result: Cost Plan opens with a error “Could Not Load Total Row”
Resolution
DE116168 is fixed in version 16.3.0
Feedback
thumb_up
Yes
thumb_down
No