Some SCRT reports for Sysview Performance Management Option for Db2 indicate version 00.00.00.
search cancel

Some SCRT reports for Sysview Performance Management Option for Db2 indicate version 00.00.00.

book

Article ID: 371982

calendar_today

Updated On:

Products

SYSVIEW Performance Management Option for DB2 for z/OS Database Management for DB2 for z/OS - Administration Suite Database Management for DB2 for z/OS - Performance Suite Database Management for DB2 for z/OS - SQL Performance Suite Database Management for DB2 for z/OS - Recovery Suite Database Management for DB2 for z/OS - Utilities Suite

Issue/Introduction

Some SCRT reporting for Sysview Performance Management Option for Db2 for z/OS (IDB2) indicate version 00.00.00. This occurs when the IDB2 batch report writer NSIGHTRW
is run and the JCL does NOT include a //PTILIB DD statement. (This DD has always been optional for the IDB2 report writer)

Resolution

Without PTILIB:

STC68563-------FRIDAY,  05/07/2024--------
STC68563       IEF695I  START IDB2AR11 WITH JOBNAME IDB2AR11 IS ASSIGNED TO USER
STC68563       $HASP373 IDB2AR11 STARTED
STC68563       IEF403I IDB2AR11 STARTED -TIME=01.04.02
STC68563       CAJR250I STEPNAME STEP   PGM=      CCODE EST-COST EXCPS ELAPSED TOT-CPU PAGE-IN P
STC68563       IEF170I 1 IDB2AR11 CAJR250I STEPNAME STEP PGM=  CCODE EST-COST   E
STC68563        CAJR251 I UNLOAD 1  IDCAMS       0000                $  .00        0          00:00:00.04
STC68563       IEF170I 1 IDB2AR11 CAJR251I UNLOAD            1 IDCAMS 0000     $  .00
STC68563       DBG39049I         01:04:02    INITIALIZING SYSVIEW FOR DB2 20.0
STC68563        CAJR251 I UNLOAD 2  IDB2UIFI      0000                $ 1.43             0          00:00:00.04.91   00:00:00.22
STC68563       IEF170I 1 IDB2AR11 CAJR251I UNLOAD            2 IDB2UIFI   0000     $  1.43
STC68563       IEC130I  PTILIB     DD STATEMENT MISSING <=====================================================
STC68563        CAJR251 I UNLOAD 3  INSIGHTRW   0004                $ 17.11             0          00:00:00.05.82   00:00:00.38 

  

With PTILIB:

STC68563-------TUESDAY,  09/07/2024--------
STC68563       IEF695I  START IDB2AR11 WITH JOBNAME IDB2AR11 IS ASSIGNED TO USER
STC68563       $HASP373 IDB2AR11 STARTED
STC68563       IEF403I IDB2AR11 STARTED -TIME=13.31.03
STC68563       CAJR250I STEPNAME STEP   PGM=      CCODE EST-COST EXCPS ELAPSED TOT-CPU PAGE-IN P
STC68563       IEF170I 1 IDB2AR11 CAJR250I STEPNAME STEP PGM=  CCODE EST-COST   E
STC68563        CAJR251 I UNLOAD 1  IDCAMS       0000                $  .00        0          00:00:00.04
STC68563       IEF170I 1 IDB2AR11 CAJR251I UNLOAD            1 IDCAMS 0000     $  .00
STC68563       DBG39049I         13:31:03    INITIALIZING SYSVIEW FOR DB2 20.0
STC68563       CAJR251 I UNLOAD 2  IDB2UIFI      0000                $ 1.43             0          00:00:00.04.91   00:00:00.22
STC68563       IEF170I 1 IDB2AR11 CAJR251I UNLOAD            2 IDB2UIFI   0000     $  1.43
STC68563       DBG39049I         13:31:10    HIGHEST MAINT LEVELSET IS 20.0.12 <====================================== 
STC68563        CAJR251 I UNLOAD 3  INSIGHTRW   0004                $ 21.75             0          00:00:00.05.05   00:00:00.48 
STC68563       IEF170I 1 IDB2AR11 CAJR251I UNLOAD            3 INSIGHTRW   0004     $  21.75

 
Note: If a PTILIB DD is added a PTIPARM DD must also be included.